Current Bridge Projects:
Champion Street over Swan Creek, Bridge no. 805 - Bridge Rehabilitation - Original consultant, Proudfoot Associates, to update existing plans, specifications, and quantities. Construction contract to be bid Spring 2011. Construction expected to begin in late Spring 2011.

Crabb Road over Shantee Creek, Bridge no. 455 - Bridge Replacement
(pending budget approval)

Suder Avenue over Ottawa River, Toledo Bridge no. 350 - Bridge rehabilitation 2011 - Consulting Engineering firm Tetra Tech, Inc. was selected and is preparing the design plans and specification for this bridge. Stage 2 plans review completed. Stage 3 plans in progress. ROW work on-going and environmental work is complete.
Schwartz Rd over Ottawa River, Toledo Bridge no. 312 - Bridge replacement 2011 - Construction has been completed and the bridge is now open to traffic.

Current Levee (Dike) Projects:
Swan Creek Dike
The Rehabilitation Design and Certification contract has been awarded to Fishbeck, Thompson, Carr and Huber, Inc (FTC&H). FTC&H Is completing the GIS and survey review. They will have the soils testing completed in April. The embankment protection analysis will be completed in March. The rehabilitation design should start in April with the completion expected in May or June. Bidding for construction is expected to start following plan completion. The actual construction is anticipated to take two to three months.
Point Place Dike
The Rehabilitation Design and Certification contract has been awarded to Fishbeck, Thompson, Carr and Huber, Inc (FTC&H). FTC&H has started the GIS and survey review. Soil testing is planned to start in April. Preliminary schedule is for the design completion in August and construction from October 2011 through October 2012.